vansig wrote:
The trick will be arranging that power circuitry to deliver the constant 50/60Hz 3phase output, as the pulse rate goes up and down to match power demand from the local/national grid.
that’s just about like keeping a flywheel at constant speed
The simple solutions are the best….
I’m at Culham (the site of the JET & MAST tokamaks) at the moment – they have a couple of huge flywheels. Although theirs are used to give a pulse of output rather than constant supply.