Just noticed a major error in the arithmetic being thrown around above:
Focus Fusion:
240 5 MW plants = 1.2 GW
240 x $200,000 = $48 Million
1.2 GW @ $48 Million = .40 per W
And that is just startup costs. Look at fuel costs, upkeep, labor, the lessened need for large power lines