Using the Georgia coal plant as an example, lets run the numbers.

Coal: 1.2 GW @ $1.4 Billion = $1.17 per W

Focus Fusion:

240 5 MW plants = 1.2 GW

240 x $200,000 = $48 Million

1.2 GW @ $48 Million = .40 per W

And that is just startup costs. Look at fuel costs, upkeep, labor, the lessened need for large power lines…

The ROI of Focus Fusion is outstanding. Perhaps the best ever seen.