zapkitty wrote: … and wouldn’t the new switches, from Raytheon I believe, be tested by using them in LPPX-1?
Does it make sense to think of testing switching devices seperate from the reactor proper? I would hope it feasible to say we can fabricate a small vaccuum chamber with electrodes as a dummy load?