asymmetric_implosion wrote:
I hope the yield number is wrong…66 kJ per shot with a 5 MW plant means 75 Hz operatio
That was taken from their Sankey diagram as “gross fusion yield” and after reasonable losses are taken away, they will get 5 MW @ 200 Hz.
asymmetric_implosion wrote:
Ceramics are the devil
😛