Reports on the EPR and AP1000 can be found at http://www.hse.gov.uk/newreactors/reports.htm These are part step 3 of the generic design assessment (GDA)
The final part (step 4) is almost complete. This article puts the EPR slightly ahead http://www.neimagazine.com/story.asp?sc=2059059
Hopefully since these plans are so far down the road, the events in Japan will not stall proceedings too much.