#1819
Sigma
Participant

Problem with Alt energy is that the energy density is too low to power everything, unless radical new technologies and changes occur. The infrastructure would take 1-2 decades to switch to alt energy resources. While I believe it would be a good idea to incorporate alt energy into everything, we would probably still require workhorse energy facilitators i.e. Fusion.