Polywell’s minimum power output is 100MWe. That’s because of its scaling law of size^5.
I’m not quite sure about FF’s limits itself, because DPFs scale linearly in respect to their size. So theoretically anything between beer-bottle-sized (for the whole device, but adding the cooling system) and big-factory-sized should be possible in maybe 30 years — if it’s possible at all.